« Prev  [ 8 of 14 ]  Next »

M.C. Integ Guernsey Electricity Ltd

Contract Value: Total Value £ 320,000.00 Details: This project involved the Insulation and cladding of 4 No. 2300m3 Heavy Fuel Oil storage Tanks. We insulated the Tank shells using medium density mineral wool slab finished with profiled sheeting secured with aluminium bands and expansion sets. The roof was insulated using Heavy density mineral wool slab (to withstand foot traffic) finished with a cone, prefabricated in our workshop in the UK. This project also required the procurement and shipping of all materials from the mainland. We have secured the contract to insulate
<b>Contract Value:</b>
Total Value £ 320,000.00

<b>Details:</b>
This project involved the Insulation and cladding of 4 No. 2300m3 Heavy Fuel Oil storage Tanks. We insulated the Tank shells using medium density mineral wool slab finished with profiled sheeting secured with aluminium bands and expansion sets. The roof was insulated using Heavy density mineral wool slab (to withstand foot traffic) finished with a cone, prefabricated in our workshop in the UK. This project also required the procurement and shipping of all materials from the mainland.
We have secured the contract to insulate
[ Back ]« Prev  [ 8 of 14 ]  Next »
© Copyright 2024 Consolidated Insulation Services LtdWeb Design By Toolkit Websites